Please quote your lowest government price inclusive of VAT on the item/s listed below under the most advantageous terms in favor of the government. Submit your quotation signed by you or your representative not later than 16 November 2020.

For more information, you may contact Maiko P. Palang at (032) 233-3497 or email at [email protected]

General Conditions:

  1. PhilGEPS Registration Number/ Certificate
  2. Business Permit/ Mayor’s Permit (2019)
  3. ITR/ Business Tax Return/ EPS Print Out
  4. Omnibus Sworn Statement (For 50,000.00 and above) to be submitted before issuance of PO
  5. PCAB License (for INFRA Project Only)
  6. Management reserves the right to reject outright any contingent bids.
QuantityUnitDescription of ItemsABC (per item)
  PR 3796 SOM 
1unit32” LED TV, WXGA, USB, Multimedia Function (Photo, Music, & Video)15,000.00
1lotHDMI Cables & Connectors
*The contractor needs to supply all necessary cables and connectors required
5,000.00
1unitHDMI switcher 1-in-8 out Interface Type: HDMI Female Input Interface: 1* HDMI Output Interface: 8* HDMI
With power source. With installation services. With five years warranty
7,000.00
2unitLED TV 32” Tilt Ceiling wall mount TV bracket Material: Cold-roled sheet, black color Screen size should suit 32”-37” Tilt adjustment: 360 degrees and 15 degrees With installation services.
*Distance from the ceiling is ~0.9m-1.25m
4,000.00
1lotLabor for Installing the TVs, short-throw LCS-bluetooth speakers and setting up the HDMI switcher. The contractor needs to ensure that ALL CABLES ARE HIDDEN.
*The contractor needs to embed some of the wires, so the contractor needs to restore the walls that will be affected. The contractor needs to use moldings to hide all the cables. All necessary materials for the installation of cables are included here
47,000.00
1unitUniversal project bracket Loading capacity: 3kg-5kg Length adjustable: 43-65cm Color: White/Black Material: Steel With installation services
*The installer has to ensure that the figures are sharp
8 ,000.00

Note:    To be delivered to UP Cebu

Total Approved Budget for the Contract (ABC): PHP 90,000.00

Terms of payment: at least 45 days after acceptance of delivered items

Validity of price quotation: 60 days